Ile d’Olonne wastewater treatment plant

Missions
  • Preliminary design studies (AVP),
  • Project studies (PRO),
  • Assistance with the award of works contracts
    (ACT),
  • VISA studies (VISA),
  • Works supervision (DET),
  • Assistance with acceptance operations (AOR),
  • MC1: assistance with geotechnical studies,
  • MC2: assistance with guarantee testing,
  • MC3: planning permission,
  • MC4: application for exemption from the Coastal Act,
  • MC5: water law declaration file,
  • MC6: Natura 2000 impact study,
  • Ecological study of the WWTP site and discharge
    route,
  • Impact study

The Isle of Olonne has a wastewater treatment plant witha treatment capacity of 6,500 PE. The new treatment system includes the following structures:

  • A discharge pipe from the old to the new wastewater treatment plant;
  • Screening, compacting and bagging of rejects;
  • A 250 m³ storage tank with a pump to return it to the water line;
  • An aeration tank containing: a contact zone, an anaerobic zone, an aeration channel (phase syncopation), physico-chemical phosphorus precipitation.
  • A deaerator ;
  • A clarifier ;
  • UV disinfection ;
  • A recirculation sludge pit ;
  • A discharge station for treated water with
    metering;
  • A discharge pipe for around 900 m of
    treated water into the Vertonne river;
  • Reuse of existing lagoons in the event of
    overflow;
  • Sludge dewatering using a screw press;
  • Storage of sludge in skips;
  • Deodorisation using activated carbon.

Key figures

Project cost : 2 400 000 €

Also discover in "Water & Wastewater"

Establishing the urban rainwater management master plan for the Thonon Agglomeration

Joint operations of the EVRY and EXONA WWTPs : 340,000 P.E.

Sanitation Master Plan and wastewater treatment zones EU and EP