Owendo port containers terminal

Missions

setec ensured the General Contract Management for design and works which includes the following assignments:

  • Preliminary Design
  • Detailed Design
  • Tenders specifications
  • Assistance in awarding the works contracts
  • Works supervision
  • Review and approval of the construction design under Contractor’s scope
  • Works Acceptance
  • As-built documentation

The project aims at improving the port’s infrastructure and upgrading the open storage areas at its containers terminal.

The area developed within the project comprises a surface of approximately 37 000 sq.m divided into 2 sections, one section located along the quay of 28 000 sq.m and the second one of 9 000 sq.m.