Vue de Figeac

Computerised signal box at Figeac station

Missions
  • Design and implementation studies for signalling, energy and building of a PAI 2006 with an IHM. 
  • Supervision of the project management/implementation of signalling and energy works, technical checks and tests, all on an operational site (under scheme no. S9A1). 
  • Managing companies and suppliers under SNCF Réseau’s signalling systems contracts. 
  • Maintenance of the overall project schedule (SCMC including activities outside the scope of the consortium) 
  • Removal of installations after commissioning 

For the first time in France, SNCF Réseau has experimented with a turnkey design-build contract to create a complete signalling station for traffic on the Occitan lines linking Toulouse to Brives or Aurillac. 

As part of the engineering consortium that include INEO SCLE Ferroviaire, Thales and Vossloh, setec was appointed to manage the design and works, the SCMC, aspects of the studies (dimensioning, IHM parameterisation, building) and the performance of signalling tests on the new PAI 2006 substation before commissioning. 