Thérain catchment area ecological continuity restoration

Missions
  • Hydrological studies
  • Hydraulic modelling of the Thérain catchment area to determine the flow rates and their impact on the Oise River navigation
  • Hydrogeological and hydromorphological analysis
  • Environmental expertize (sub-consultant: Hydrosphère)
  • Technical and economic feasibility study of each restoration scenario
  • Analysis of the morphological constraints and adaptation of the proposed measures

The restoration of ecological continuity in Thérain (Seine-Normandy catchment area) by 2015 was ordered in December 2012 by the departmental authorities. The Montataire dam in Thérain, operated by the company ArcelorMittal, was considered as an impediment to the ecological continuity.

Also discover in "Port/rivers activities"

MOP-ALFOWT

Conakry – Kankan Railway line

Containers Terminal at the Port of Owendo