Overview


Métro de Riyad
Designing and building six subway lines within a very tight schedule, is the challenge of the future metro in Riyadh.

 

setec works in collaboration with partners from all around the world: Atkins, Typsa, FCC, Samsung, Strukton, Freyssinet Saudi Arabia and Alstom.

 

Assignment


SETEC is in charge of the project Management Office on line 4, 5 and 6 and of the design of the train storage and maintenance depots. The two depots, one underground and the other at grade, are integrally designed with BIM (Building Information Modeling).

Owner

Arriyadh Development Authority (ADA)

Key figures

Period of services

Key challenges