Freyssiwind WIND FARMS

Missions

This civil engineering assignment involved drafting technical specifications for the construction of wind farms worldwide.

Each step detailed precise physical and operational requirements.

The main chapters covered were:

  • Excavation work
  • Draining
  • Concrete
  • Casing
  • Reinforcement
  • Precast concrete
  • Grounding
  • Supplementary lighting work

 

The main phases were:

  • Marking by a land surveyor
  • Excavation
  • Lean concrete
  • Implementation of the frames and casing
  • Concrete pouring
  • Supplementary lighting work
  • Backfilling

Freyssinet builds concrete towers for large wind turbines under the FreyssiWind brand name.

Used instead of metal to reach heights of over 100 m, these towers use numerous specialized civil engineering techniques, such as precast C50/60 concrete elements, pretensioned exterior tendons, prestressed crossbars, assembly, heavy lifting, soil improvement by cement inlays, anchors, etc.

Freyssiwind commissioned setec  to apply its innovative construction methodology to detailed building specifications with the aim of improving its EPC project management (Engineering, Procurement and Construction).

 width=

 width=

 

Challenges

– Drafting of technical specifications enabling Freyssiwind to guarantee foundation quality

– Standards: EN, ISO and ACI

– A specific method for installing anchors and reinforcements

– A temperature control method for concrete casting

– A feedback process

 

Also discover in "Environment"

Environmental assessment of the planned offshore wind farm in Southern Brittany (AO5)

Design and construction of the Athanor sorting centre at La Tronche in France

“Les pistes” Michelin