Evolutive Vaccine Facility Project scheduling

Missions
Based on a master schedule from the basic design, setec coordinated the creation and implementation of the detailed schedules. Management of the interfaces between the many different actors is key aspect of this project. The consolidated schedule integrating these interfaces made it possible to identify the critical path and the points of attention.     In order to guarantee maximum visibility of the project's progress: : • Implementation of performances indicators (S-curve, SPI*, etc..) reviewed monthly. Transnational coordination of the scheduling team. *SPI : Schedule Performance Indicator
To design and build two new generation vaccine production plants, one in Neuville-sur-Saône and one in Singapore.  An innovative approach with sites capable of producing several vaccines simultaneously, and capable of integrating future vaccines.  This transnational project, managed from France, includes design studies for the production buildings common to both sites, creation of the site in Asia, associated construction, commissioning and qualification activities, as well as coordination with the process entities for future vaccines.

Challenges

Project consolidated vision on both sites. Control of deadlines through good interface management.