The Catalan wind farm is located near Perpignan in the Pyrénées-Orientales department in the South of France. It comprises 35 wind turbines with a total capacity of 96 MW.
In addition to implementing the turbines and the collector network, the project included creating a 33 kV/225 Kv substation.
This substation, which increases the voltage of the electricity generated and delivers it to the electricity grid, is composed of two 90 MVA transformers, reactive power compensation equipment and a building housing protective and control devices.