The Boutferda plant is located on the Oued El Abid stream in Beni Mallal Province, Morocco.
Platinum Power obtained a temporary permit to develop, build and operate the Boutferda hydropower plant. Our consortium was in charge of detailed design and drafting call for tender documents for the entire hydroelectric facility.
The project involved:
- A concrete intake barrage, approximately 25 m high
- A watercourse on the right bank composed of an 8.5 km underground passage followed by an overground penstock pipe
- A power station housing two horizontal Francis turbines with a total installed capacity of 17 MW
- A 60 kV power line linking to the national grid at a distance of approximately 45 km