The Régie de Gaz et d’Electricité de Bonneville was considering producing renewable energy and commissioned setec to assist in its hydropower development project.
This project takes place on the Bronze river, near the town of Bonneville. It is characterized by a water intake located at an altitude of 720m, a 1600m penstock, and a power plant equipped with a Pelton turbine. The installed capacity is 1.8 MW and production is expected to reach 7 GWh per year.