visuel générique projet

Rehabilitation of road R12 in Assok : Ngomo – Minvoul – Riviere Kôm

Missions

DTP Terrassement entrusted setec for assistance in the production of:

  • feasibility studies,
  • preliminary design studies,
  • the impact study the funder requests.

This assignment shall help DTP Terrassement controlling the project cost in order to ensure the funding of the contract with the banks.

DTP Terrassement was approached for a project including design, construction and financing of a road in Gabon, inside Woleu-Ntem province, between Oyem and Minvoul, with an extension unto the border with Cameroun, excluding river Kom crossing, (approx. 120km). The project consists of rehabilitating the ordinary soil road into a surfaced road to be included to National Roads network. When crossing urban areas, urban roads will be designed to enable a V85: 50 km/h traffic, in order to control the impacts on buildings.

Challenges

Feasibility and preliminary studies

Key figures

Total amount of the project:

600 000 000 €

Also discover

General and technical studies for the Sud Léman rail-link

Computerised signal box at Figeac station

Project management for the upgrading of the fumes treatment system at the saint-ouent waste-to energy plant