Dibwangui hydroelectric development project

Missions

Our tasks:
– Conduct an initial project assessment. Look at:
* Project Design
* Geotechnical data
– Conduct an optimization study
– Assist in the budgeting process
– Technical assistance and proposal of other alternatives for:
* the dam
* the canal
* the production plant, including a stability study
* the high-voltage substation

A 15MW hydro power plant is set to be constructed in Dibwangui following a signed concession agreement between the government of Gabon, FGIS, and Eranove.
The project includes:
– Closure works on the Louetsi river to create a reservoir,
– Hydraulic tunnels, pipes, and channels (inlet tunnels)
– A hydroelectric plant, equipped with 3 Kaplan turbines:
* Flow rate: 25 m3/s /turbine.
* Nominal power: 5.1 MW/turbine.
* Net head: 23.7 m.
– An outdoor electrical substation,
– Overhead power lines between Dibwangui and Bongolo,
– Remodelling the Bongolo substation
– Constructing ancillary facilities necessary to the operation of the facility,
– The deconstruction or rehabilitation of temporary facilities

Challenges

Creating a BIM (Building Information Modeling) / 3D model for both the dam and the power plant was very useful in estimating water quantity accurately, as well as in the preventive maintenance process.

Also discover in "Renewable energy"

Project management for the upgrading of the fumes treatment system at the saint-ouent waste-to energy plant

Environmental assessment of the planned offshore wind farm in Southern Brittany (AO5)

Ex-ante evaluation of the BeMed project: working towards a plastic-free Mediterranean Sea