visuel générique projet

Tour KCC Koweitt

Missions

Design of the overall project structure

Tender Design: costing and structural principles
Detailed Design: BA structure: sizing calculations and production of layout and reinforcement drawings
Steel structure: sizing calculations and production of overall and assembly drawings.

Key figures

‘- Matière:
14 000 t de métal
270 000 m3 de béton

– Surface:
270 000 m² SDP

Also discover

General and technical studies for the Sud Léman rail-link

Computerised signal box at Figeac station

Project management for the upgrading of the fumes treatment system at the saint-ouent waste-to energy plant