Overview


The project aims at improving the port’s infrastructure and upgrading the open storage areas at its containers terminal.

The area developed within the project comprises a surface of approximately 37 000 sq.m divided into 2 sections, one section located along the quay of 28 000 sq.m and the second one of 9 000 sq.m.

Assignment


setec ensured the General Contract Management for design and works which includes the following assignments:

•Preliminary Design
•Detailed Design
•Tenders specifications
•Assistance in awarding the works contracts
•Works supervision
•Review and approval of the construction design under Contractor’s scope
•Works Acceptance
•As-built documentation

Owner

Key figures

Period of services

April 2013 to December 2016

Key challenges