The A65 motorway links the Bordeaux-Toulouse A65 motorway to the Bayonne-Pau-Toulouse A64 motorway. It also links Mont-de-Marsan.
The delivery date and planned service launch have required timely interim inspection reports.
Detailed inspections of the engineering structures in the central section of the A65 motorway
France
• Concession: 60 years
• Planned construction period: 46 months
• Approximate investment: €1.2 bn
•Length: 150 km
• Cross-section: 2 x 2 lane motorway
• 2 motorway interchanges
• 10 junctions (including 2 differed)
• 2 service areas
• 4 rest areas
• Earthwork: 1.6 million m3 to be moved by 2010
• 150 ouvrages d’art dont 15 viaducs
The A65 motorway links the Bordeaux-Toulouse A65 motorway to the Bayonne-Pau-Toulouse A64 motorway. It also links Mont-de-Marsan.
The delivery date and planned service launch have required timely interim inspection reports.