Missions

Setec is providing integrated project management for the design and construction consortium for the new Regional Express Train (TER) line project:

  • Piloting the entire project management consortium and coordinating the project work packages (civil engineering, re-establishments, footbridges, stations, halts, buildings, track, energy, catenary, signalling, rolling stock)
  • Conducting the detailed preliminary design studies for 55 km of double track, the Thiès railway branch (22 km of double track, including 25kv electrification and ERTMS 2 signalling)
  • A mission to determine the overall lifecycle costs of the project
  • Management of internal and external business interfaces
  • The OPC mission during the design and works phases
  • The VISA for the execution studies
  • Assistance with drafting the temporary operating and safety regulations (RTES)
  • Assistance with works acceptance operations
  • Static and integration tests

“The project involves creating an electrified double track between Dakar and AIBD airport, with a first section as far as Diamniadio (38km) and a 2nd section as far as AIBD (17km). The project also includes the rehabilitation of the metric track between the port of Dakar and Sébikotane (41 km), and the construction of 3 stations and 8 intermediate stops, as well as a maintenance and storage site (SMR) with a control and command post (PCC) and an infrastructure maintenance site (SMI). It will serve 14 stations on the route between Dakar and AIBD in 50 minutes at 160 km/h, with a capacity of 500 and 1000 seats depending on the type of train.

“Cities & territories

Key figures

Project cost: €600,000,000