
The Plomin C project consists of the construction of a coal-fired thermal power plant on a site already accommodating two plants in operation in
the Istria region of Croatia. Units 1 and 2 were built in 1969 and 2000, respectively, and Plomin C will double the capacity of the site, even after the
dismantling of unit 1. The Plomin C project includes the construction of a new production unit (on the present storage area), a new coal storage area, a harbour, a conveyor belt, a pumping station and a tunnel for the cooling
system. The project location is in a geological environment consisting mainly of rock (limestone).