
To secure its imports and exports of Liquefied Natural Gas (LNG), the KUWAIT / NATIONAL PETROLEUM COMPANY (KNPC) has launched the construction of a giant terminal on the Al-Zour site.
The project, which must be completed in 2020, consists of building a regasification plant (USD 1.39bn) and 8 storage tanks with an individual capacity of 225,000 m3 (USD 1.52bn), all located on a platform reclaimed entirely from the sea.
This major “Design & Build” contract was won by HYUNDAI ENGINEERING & CONSTRUCTION, which entrusted the design to the Korean firm KOGAS TECH, specialized in engineering and maintenance of onshore and offshore gas facilities.